Scope of Works: Works involve laying a network of pipes to create a new water main and hydrant mains around the Eveleigh Precinct. These water/hydrant mains will be connected to the existing and the new water/hydrant feeding points. At the other end, they will be connected to all current outlets and buildings.

Works will include significant excavation, 3 x ULXs, and construction work, all in a live functioning environment. 