NEW PROJECT - Central Station Lift Replacement

Main Image

We are delighted to advise that Gartner Rose have been appointed by Sydney Trains to undertake the works required for the replacement of a lift at Central Station. The project is expected to commence on site in early March.

A brief scope of the works include:

  • Dismantle and removal of the existing lift and lift room equipment (fixtures, fittings and wiring)
  • Installation of the new lift
  • Modification works to the existing lift shaft to comply and accommodate the new lift 
  • Associated electrical works including CCTV.

The project will complement our recent contract award at  Strathfield Station and other previous lift replacements at railway stations within the Sydney region. 

We look forward to a safe and successful project. 

CONTACT US
Head Office Level 16, 213 Miller Street North Sydney NSW 2060
Tel: 9935 5900
Contact Us
Health & Safety AS/NZS 4801 Certified System Enviroment ISO 14001 Certified System Quality ISO 9001 OHSAS 18001 Certified System Federal Safety Accreditation Master Building Association NSW Member Housing Industry Australia
Transport for NSW - Authorised Engineering Organisation