Gartner Rose is delighted to announce the successful completion of the
science labs at Casula for Bovis Lend Lease. Congratulations to all
involved on a safe and successful project.
Hours worked: 9,022 hours
Lost time injuries: ZERO
Duration: 45 weeks
Works Completed:
This project involved the construction of a new building containing 4 science labs, 1 prep room, 1 chemical storage room, a new access road and landscaping.
Works involved screw piling, suspended concrete floor slab, structural steel framework, clad in Scyon Axon vertical FC sheeting together with plasterboard, Vinyl / Carpet floor linings, wet lab joinery and furniture including fume cupboards.
The labs were fully equipped with data and Interactive learning equipment in line with the CEO vision for interactive learning into the 21st century.
This building was constructed on the side of a steep ravine in unstable ground conditions. Being in a bushfire prone area the building required a level of construction in accordance with strict bushfire controls.
Hours worked: 9,022 hours
Lost time injuries: ZERO
Duration: 45 weeks
Works Completed:
This project involved the construction of a new building containing 4 science labs, 1 prep room, 1 chemical storage room, a new access road and landscaping.
Works involved screw piling, suspended concrete floor slab, structural steel framework, clad in Scyon Axon vertical FC sheeting together with plasterboard, Vinyl / Carpet floor linings, wet lab joinery and furniture including fume cupboards.
The labs were fully equipped with data and Interactive learning equipment in line with the CEO vision for interactive learning into the 21st century.
This building was constructed on the side of a steep ravine in unstable ground conditions. Being in a bushfire prone area the building required a level of construction in accordance with strict bushfire controls.