The Kangy Angy Maintenance Centre has been constructed to maintain the NSW TrainLink New Intercity Fleet (NIF). Gartner Rose was appointed to construct the new free standing Driver Amenities Building, which was completed over the course of 18 weeks, with 3,811 hours worked to complete the project.

Works included:

  • Piling – 450mm diameter bored piles, 12m depth with 2m socketed into rock
  • Demolition – Demolition of asphalt
  • Earthworks – Detailed excavations for ground beams and service trenches
  • Concrete FRP – Ground beams and slab
  • Structural Steel – Modules bolted together at site, approx. 8.25T
  • Roof / Cladding – Kingspan insulated panel
  • Fitout – Partitions, flooring, painting, tiling, joinery, windows and doors
  • Services – Electrical / communications / security, hydraulic & mechanical
  • External works – Asphalt prep, bollards and kerbs

Sector

Civil and Commercial

Value

$1 million

Client

UGL Limited | Transport for NSW

Duration

March 2021 - July 2021

  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building
  • Kangy Angy Driver Amenities Building

Related Projects


Accreditations


Supply Nation Member
HIA
Master Builders Association NSW member

Gartner Rose would like to acknowledge the traditional custodians of this land. We pay our respects to Elders past, present and emerging.
We recognise their culture, traditions and connections to the land.

© 2024 Gartner Rose Pty Ltd. All rights reserved.