Manly Hydraulics Laboratory


The Manly Hydraulics Laboratory utilises water from Manly dam to conduct scale modelling and testing of water flows in a variety of real-world scenarios.

The project scope included, but is not limited to:

  • Complete demolition of the existing hydraulics and ancillary buildings
  • Remediation of the contaminated site
  • Construction of the new hydraulics building including piles, structural footings, slabs and retaining walls, structural steel portal frame and cladding, plus internal finishes
  • Construction of three new testing tanks inside the building, providing a massive improvement in modelling capabilities
  • Upgrade of the existing hydraulic testing system
  • Services including drainage, hydraulics, electrical and mechanical
  • External work including hardstands and landscaping

Sector

Civil and Commercial

Value

$7.1 million

Client

Manly Hydraulics Laboratory

Duration

June 2022 - June 2023

  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory
  • Gartner Rose Manly Hydraulics Laboratory

Related Projects


Accreditations


Supply Nation Member
HIA
Master Builders Association NSW member

Gartner Rose would like to acknowledge the traditional custodians of this land. We pay our respects to Elders past, present and emerging.
We recognise their culture, traditions and connections to the land.

© 2024 Gartner Rose Pty Ltd. All rights reserved.