WESTCONNEX New M5 - MOC2 Buildings

Main Image
Gartner Rose have been appointed by CPB Dragados Samsung Joint Venture to undertake the building works required for the MOC2 Buildings as part of The WestConnex New M5 (stage 2).

Delivered by Sydney Motorway Corporation as a series of separate projects, the WestConnex New M5 project will run from the existing M5 East corridor at Beverly Hills via twin tunnels to St Peters, providing improved access to the airport, South Sydney and Port Botany precincts.

The works appointed Gartner Rose include the fitout works required for the substation and ventilation buildings located at Bexley.

CONTACT US
Head Office Level 16, 213 Miller Street North Sydney NSW 2060
Tel: 9935 5900
Contact Us
Health & Safety AS/NZS 4801 Certified System Enviroment ISO 14001 Certified System Quality ISO 9001 OHSAS 18001 Certified System Federal Safety Accreditation Master Building Association NSW Member Housing Industry Australia
Transport for NSW - Authorised Engineering Organisation