WESTCONNEX New M5 - MOC3 Buildings

Main Image

Gartner Rose have been appointed by CPB Dragados Samsung Joint Venture to undertake the building works required for the MOC3 Buildings as part of The WestConnex New M5 (stage 2).

Delivered by Sydney Motorway Corporation as a series of separate projects, the WestConnex New M5 project will run from the existing M5 East corridor at Beverly Hills via twin tunnels to St Peters, providing improved access to the airport, South Sydney and Port Botany precincts.

The works appointed to Gartner Rose include roofing, cladding, supply and installation of specialised doors & frames, ceilings, external linings and hydraulics to the Exhaust Ventilation, Supply Ventilation and Substation Buildings.

Roofing will include but not be limited to the supply and install of the thermal and acoustic insulation system.

The MOC3 Buildings are scheduled to be complete by January 2020 and will complement our current project at Kingsgrove for the MOC1 Buildings also part of the WESTCONNEX NewM5. 




CONTACT US
Head Office Level 16, 213 Miller Street North Sydney NSW 2060
Tel: 9935 5900
Contact Us
Health & Safety AS/NZS 4801 Certified System Enviroment ISO 14001 Certified System Quality ISO 9001 OHSAS 18001 Certified System Federal Safety Accreditation Master Building Association NSW Member Housing Industry Australia
Transport for NSW - Authorised Engineering Organisation