Rhodes Footbridge Upgrade

Main Image

We are delighted to advise that Gartner Rose have been appointed by Billbergia to undertake the construct and install of a new pedestrian foot bridge between the new Rhodes Central development and the existing station footbridge.

The project will provide access into the Rhodes Train station. The works include an onsite installation of concrete support structure, the offsite manufacture of a steel framed bridge, with a planned crane install scheduled for a possession in mid-June 2022. Once the structure is installed, the fit-out works will be completed inclusive of glazed walls, new roofing and internal fit out inclusive of wayfinding, and CCTV compatible with the existing station.

We look forward to a safe and successful project.

CONTACT US
Head Office Level 3, 15 Blue Street North Sydney NSW 2060
Tel: 9935 5900
Contact Us
Health & Safety AS/NZS 4801 Certified System Enviroment ISO 14001 Certified System Federal Safety Accreditation Master Building Association NSW Member Housing Industry Australia
Transport for NSW - Authorised Engineering Organisation