Bombo Wastewater Treatment Plant Roofing

Main Image
Client: Sydney Water

Project Name: Bombo Wastewater Treatment Plant Roofing

Location:  Bombo Wastewater Treatment Plant 

Scope of Works:   Scope of works involve the stripping of 800m2 of Colorbond roofing and replacing with new insulation and marine grade aluminium to the administration building, the chemical dosing building and the chlorination building.  New Aluminium ½ round gutters will then be installed on the freshly painted fascias.

Gartner Rose will also replace all of the timber fascias and fibro soffits to the admin and chlorination buildings. New main entry glass doors and a new aluminium roller door will be installed to the admin building.

The chemical dosing building will be completely stripped down to the heavy steel frame, new purlins, roof and wall cladding will then be installed.

New exterior lights and signage will then be installed to all buildings prior to handover.

CONTACT US
Head Office Level 16, 213 Miller Street North Sydney NSW 2060
Tel: 9935 5900
Contact Us
Health & Safety AS/NZS 4801 Certified System Enviroment ISO 14001 Certified System Quality ISO 9001 OHSAS 18001 Certified System Federal Safety Accreditation Master Building Association NSW Member Housing Industry Australia
Transport for NSW - Authorised Engineering Organisation