Wesley College Project Completion
Gartner Rose is delighted to advise the safe and successful completion of the Wesley College Fitout and Lift Installation project.
The scope of works included, but not limited to:
- Fitout of the main wing roof space (Level 2) to create six new bedrooms, storage areas, study centre, small coffee lounge and additional showers and toilet amenities
- Construction of two new stairways from Level 1 to provide access to the new Level 2 roof space
- Installation of a new external lift, connected to the building by enclosed lobbies on each floor
- Main wing roof space decontaminated of hazardous lead dust and asbestos
- Construction of six copper dormers to serve the new bedrooms, along with a large dormer to the study area connected to a new outdoor terrace
- Implementation of firewall installations to compartmentalise the building
Congratulations to everyone for bringing this project to a safe completion. We extend a special thanks to the project team, subcontractors and suppliers.
Michael, Marc and Daniel.