During 16 weeks of construction, 2,982 hours were worked to re-roof the administration, chlorination and chemical storage buildings at the Bombo Waste Water Treatment Plant, in order to maintain their operational performance.

The works involved the replacement of 842m2 of roof sheeting and the repairs of structural steel members, all whilst protecting the interiors of the buildings from water ingress. Marine grade aluminium roof sheeting was used given the extremely harsh conditions faced by this facility.

Further works included:

  • Construction of a fire separation wall
  • Replacement / repair of all damaged steel and timber framing
  • Replacement / repair of eaves and soffits
  • Replacement of the roller door and glazed entry door

All works were undertaken without impacting the operation of this critical infrastructure for Sydney Water.

Sector

Roofing

Value

$557k

Client

Sydney Water

Duration

December 2017 - April 2018

  • Gartner Rose Bombo WWTP Roofing
  • Gartner Rose Bombo WWTP Roofing
  • Gartner Rose Bombo WWTP Roofing

Related Projects


Accreditations


Supply Nation Member
HIA
Master Builders Association NSW member

Gartner Rose would like to acknowledge the traditional custodians of this land. We pay our respects to Elders past, present and emerging.
We recognise their culture, traditions and connections to the land.

© 2024 Gartner Rose Pty Ltd. All rights reserved.