Gartner Rose Eveleigh Maintenance Precinct

Eveleigh Maintenance Precinct


Works involved laying a network of pipes to create a new water main and hydrant main around the Eveleigh Precinct. These water / hydrant mains were connected to the existing and new water / hydrant feeding points. At the other end they were connected to all current outlets and buildings.

The scope of works included, but was not limited to:

  • Below ground Fire Hydrant Ring Main and under line crossings, including Directional Drilling
  • Fire Pump and Booster
  • Fire Pump enclosure
  • Hydrant Ring Main to shed roads in maintenance building
  • Testing and commissioning

Sector

Civil and Commercial

Value

$1.5 million

Client

Sydney Trains

Duration

April 2013 - December 2013

  • Gartner Rose Eveleigh maintenance Precinct
  • Gartner Rose Eveleigh maintenance Precinct
  • Gartner Rose Eveleigh maintenance Precinct
  • Gartner Rose Eveleigh maintenance Precinct
  • Gartner Rose Eveleigh maintenance Precinct

Related Projects


Accreditations


Supply Nation Member
HIA
Master Builders Association NSW member

Gartner Rose would like to acknowledge the traditional custodians of this land. We pay our respects to Elders past, present and emerging.
We recognise their culture, traditions and connections to the land.

© 2024 Gartner Rose Pty Ltd. All rights reserved.