Eveleigh Maintenance Precinct
Works involved laying a network of pipes to create a new water main and hydrant main around the Eveleigh Precinct. These water / hydrant mains were connected to the existing and new water / hydrant feeding points. At the other end they were connected to all current outlets and buildings.
The scope of works included, but was not limited to:
- Below ground Fire Hydrant Ring Main and under line crossings, including Directional Drilling
- Fire Pump and Booster
- Fire Pump enclosure
- Hydrant Ring Main to shed roads in maintenance building
- Testing and commissioning
Sector
Civil and Commercial, Rail
Value
$1.7 million
Client
Sydney Trains
Duration
May 2017 - November 2018