Gartner Rose was appointed by Transport for NSW and Sydney Trains to undertake works required for a lift replacement at Ashfield Station.
The project was undertaken within a live environment, with the scope of works including, but not limited to:
- Dismantle and removal of the existing hydraulic lift
- Modification of the existing lift shaft to accommodate the new lift
- Fire protection services
- Electrical works including CCTV and lighting
- Mechanical services
- Installation of the new electric 15 passenger lift
Sector
Rail
Value
$572k
Client
Sydney Trains
Duration
August 2023 - December 2023